Time splitting method that generates predictions one month after the analysable start.
Copyright: | 2019 David Monllao {@link http://www.davidmonllao.com} |
License: | http://www.gnu.org/copyleft/gpl.html GNU GPL v3 or later |
File Size: | 56 lines (2 kb) |
Included or required: | 0 times |
Referenced: | 0 times |
Includes or requires: | 0 files |
one_month_after_start:: (2 methods):
get_name()
wait_period()
Class: one_month_after_start - X-Ref
Time splitting method that generates predictions one month after the analysable start.get_name() X-Ref |
The time splitting method name. return: \lang_string |
wait_period(\core_analytics\analysable $analysable) X-Ref |
The period we should wait until we generate predictions for this. param: \core_analytics\analysable $analysable Not used in this implementation. return: \DateInterval |